POWER & CHARGING
AT RISKBattery reserve
31% P10Low reserve <35%
3 robots below 35%4 currently chargingDischarge P95 1.3×
Fleet reliability, live robot state, lifecycle transitions, and response readiness.
Start here: select any robot to inspect health, live metrics, and the recommended response without leaving Overview.
Power, physical systems, control, connectivity, localization, and autonomy — ranked by operational risk.
Every robot state change has an operational reason, an owner, and a safety gate.
Ranked by recoverable throughput and safety risk.
Translate robot health into the staffing and throughput decision the shift needs now.
Measure whether this fleet scales without silently shifting work back to operators.
Rate, errors and duration share one synchronized time window.
| Time | Planned | Completed | Failures |
|---|---|---|---|
| 12:00 | 974 | 948 | 6 |
| 13:00 | 1154 | 1119 | 7 |
| 13:42 | 1273 | 1241 | 7 |
| 14:00 | 1328 | 1284 | 7 |
Resources and risks for the next operating window.